projectfacts and BMD exchange data in both directions: master data, HR data and costs come out of BMD, invoice and attendance data go back. Automatically, without anyone uploading a file.

Enquire now

What the BMD connection in projectfacts does

In Austria, BMD is the standard for accounting and payroll. So that projectfacts and BMD do not run side by side, we connect the two systems through an automated data exchange: customer data, HR data and costs come out of BMD, while invoice data and attendance times go back to payroll.

Connections of this kind have been built for customers and are running in production. The exchange uses CSV files overnight, on schedule and without anyone lifting a finger. Nobody has to export a file, open it or upload it to a portal.

What the BMD connection is good for

Both directions

Not just an export: master data and costs come out of BMD, times and invoices go back.

Overnight instead of by hand

The exchange runs regularly and automatically. No manual upload into BMD.

Set up for your environment

We match fields, accounts and number ranges to your BMD installation and your accountancy firm.

From BMD into projectfacts

Three data flows run from BMD into projectfacts. All three are read in overnight, so projectfacts always holds the state of your accounting.

Costs on the right projects

Costs from BMD are matched to the right project through the cost centre and posted there as entries. If a cost centre is not yet known in projectfacts, the system reports it and assigns the costs later, as soon as the cost centre is linked to a project. Nothing is left lying around. What comes of it is visible in project controlling.

Customer data from accounting

Customer data is taken over with company name, legal form and VAT identification number, matched through the customer number. Fields that come from BMD are updated; fields you maintain only in projectfacts are left untouched. That keeps your CRM clean without accounting overwriting it.

HR data per employee

Holiday entitlement, working time model and cost unit come from BMD through the personnel number. On every run the system checks whether anything has changed and either creates a new HR record or adjusts the values. The master data in personnel administration is therefore always the state of payroll.

From projectfacts into BMD

In the other direction, projectfacts supplies exactly the data BMD needs for payroll and accounting.

Attendance data for payroll

projectfacts provides attendance data as CSV: holiday and sick leave as well as office, home office and external work, each with start and end, plus date and personnel number. Payroll then works on the same times your employees book anyway in working time recording.

Invoice data for accounting

The invoice data from invoicing is provided by projectfacts as a file that is read into BMD. Figures are not retyped and not maintained twice.

Why a file is entirely enough

BMD reads the structure of an import file from its header row and works out for itself which data sits in which column. That is exactly what the freely configurable list export in projectfacts plays into: you set export columns, date format, file name and character encoding so that the file looks the way your BMD environment expects it. More on this under financial accounting.

Do you work with BMD?

Tell us which data travels back and forth between your accounting and your operational system today. In conversation we will look at which direction is worth doing first.

Request a consultation

How the connection comes about

The BMD connection is not a switch in the configuration; it is set up for your environment as part of a project. There is a reason for that: chart of accounts, number ranges and cost centre logic differ in every company, and the accountancy firm has its own requirements.

Agree the fields

We clarify which data should run in which direction and which key is used to match it, as a rule the customer number, the personnel number and the cost centre.

Set up the run

The exchange is set up as a regular overnight run and tested once against your BMD environment, so the file is read in without any rework.

RZL and DATEV too

If your accountancy firm does not work with BMD but with RZL or DATEV Austria, the route is the same.

Your benefits at a glance

No duplicate maintenance

Master data sits once in BMD and flows from there into projectfacts.

No file upload

The exchange runs overnight, not as a chore at the end of the month.

Clean payroll

Holiday, sick leave and attendance come from the booked times.

Still have questions? We have the answer.

Would you like to connect projectfacts to BMD, or find out which data is worth exchanging in your case? Talk to us.

Frequently asked questions about the BMD interface

Is there an interface between projectfacts and BMD?
Yes. BMD connections have been built for customers and are running in production, in both directions: customer and HR master data as well as costs come out of BMD, and invoice and attendance data go back to payroll. The exchange runs as CSV overnight, without anyone uploading a file. The connection is set up for your BMD environment as part of a project.
Which data runs from BMD into projectfacts?
Costs, which are matched to a project through the cost centre and posted there as entries. Customer data with company name, legal form and VAT identification number, matched through the customer number. HR data such as holiday entitlement, working time model and cost unit, matched through the personnel number.
Which data does projectfacts hand back to BMD?
Attendance data as CSV, meaning holiday and sick leave as well as office, home office and external work with start and end, each with date and personnel number. Alongside that, the invoice data from invoicing as a file for accounting.
Does someone have to upload the file into BMD?
No. The exchange is set up as a regular overnight run. Unlike solutions that produce an export file and leave the upload to the user, the exchange runs on schedule and without any manual step.
Are changed HR records detected?
Yes. On every run the system checks whether values have changed and either creates a new HR record or adjusts the existing values. Fields that come from BMD are updated; fields you maintain only in projectfacts are left untouched.
What happens if a cost centre does not yet exist in projectfacts?
The system reports it and assigns the costs later, as soon as the cost centre is linked to a project. No amount is lost.
Is the BMD connection included as standard?
No. It is set up for your BMD environment as a project service, because chart of accounts, number ranges and cost centre logic look different in every company. What that means in your case is something we clarify in the initial consultation.
Does this also work with RZL or DATEV Austria?
Yes. The route is the same: the freely configurable list export in projectfacts is set to the format your accountancy firm reads in.